Children’s Museum Pre-Construction Services

SCOPE OF WORK
The existing museum was looking to move to a new site under Grant Park. The proposed $155M, 5 year new construction museum evolved over the year and the development budget was eventually reduced to $120M.  Project reviewed by board to include Mayor of Chicago.

There were four options to meet the budget that included: not building last bay, not fitting out all interior spaces, creating a smaller footprint or not building the expensive lower level below grade floor.

SERVICES PROVIDED :

  • Feasibility and Needs Analysis
  • Preliminary Development Planning
  • Value Engineering
  • Peer Design Review
  • Site Analysis
  • Site Planning
  • Preliminary Development Cost Estimate
  • Scheduling
  • Financing Liaison

 